Quote Yardstick Prices checked November 2026

Deck replacement cost

Replacing a deck means tearing out the old one and building new. Here's what both parts cost, for every common material, adjusted for your state.

300 sq ft pressure-treated, with removal$9,050 – $19,650
300 sq ft composite, with removal$13,550 – $28,650
Removing the old deck$5 – $15 per sq ft

Change the details

Your estimateLow – High
Total

Got a deck quote? Check if it's fair →See where it sits against this range, in seconds. Price a new deckThe full calculator and guide.

Replacement cost by material

A 300 sq ft deck at US-average prices, including a typical permit. The second column adds demolition and removal of the old deck at $5 to $15 per sq ft (Fixr, cost to build a deck (updated January 2023)).

MaterialNew deck onlyWith old deck removed
Pressure-treated pine$7,550 – $15,150$9,050 – $19,650
Cedar$9,050 – $14,250$10,550 – $18,750
Redwood$8,450 – $16,350$9,950 – $20,850
Bamboo$8,150 – $15,750$9,650 – $20,250
Mahogany$9,050 – $17,250$10,550 – $21,750
Composite$12,050 – $24,150$13,550 – $28,650
Ipe hardwood$15,050 – $21,150$16,550 – $25,650
Aluminum$30,050 – $37,650$31,550 – $42,150

Unit prices: HomeGuide, cost to build a deck, HomeGuide, pressure-treated decking cost. Removal: Fixr, cost to build a deck (updated January 2023).

Replacement cost by deck size

SizeAreaRemoval onlyPressure-treated, with removal
8x1080 sq ft$400 – $1,200$2,450 – $5,350
10x10100 sq ft$500 – $1,500$3,050 – $6,650
10x12120 sq ft$600 – $1,800$3,650 – $7,950
12x12144 sq ft$720 – $2,160$4,370 – $9,510
12x16192 sq ft$960 – $2,880$5,810 – $12,630
12x20240 sq ft$1,200 – $3,600$7,250 – $15,750
16x16256 sq ft$1,280 – $3,840$7,730 – $16,790
16x20320 sq ft$1,600 – $4,800$9,650 – $20,950
20x20400 sq ft$2,000 – $6,000$12,050 – $26,150

US average, including a typical permit.

Labor cost to build a deck, per sq ft

Labour is the biggest single part of most deck prices. HomeGuide puts deck labour at $11 to $22 per sq ft, and its pressure-treated page puts labour at about 60% of that material's price. Here is the labour part of each installed price, as we use it.

MaterialLabour shareLabour per sq ft
Pressure-treated pine60%$15 – $30
Cedar45%$14 – $21
Redwood45%$13 – $24
Bamboo45%$12 – $23
Mahogany45%$14 – $26
Composite45%$18 – $36
Ipe hardwood45%$22 – $32
Aluminum45%$45 – $56

Sources: HomeGuide, cost to build a deck, HomeGuide, pressure-treated decking cost. Labour also varies by state; pick yours in the calculator.

Repair or replace?

  • Replace when the frame, posts or footings are rotten, the ledger board where the deck meets the house is failing, or the deck no longer meets code.
  • Repair when the frame is sound and only boards or railings are worn. New boards on a sound frame skip demolition and most of the framing cost.
  • Ask the contractor to inspect the frame and ledger in writing before you decide.

Questions to ask before you sign

  1. How deep are the footings, and do they go below the frost line?
  2. How is the deck attached to the house, and is the ledger flashed?
  3. Are railings and stairs priced as separate lines?
  4. Is the permit and inspection included?
  5. Is demolition and hauling away the old deck included?
  6. Can any of the existing frame or footings be reused?

Questions people ask

How much does it cost to replace a deck?

About $9,050 – $19,650 for a 300 sq ft pressure-treated deck including removal of the old one, or $13,550 – $28,650 in composite, at US-average prices with a typical permit.

How much does it cost to remove an old deck?

$5 to $15 per sq ft, or $1,500 to $4,500 for 300 sq ft (Fixr, cost to build a deck (updated January 2023)).

What is the labor cost to build a deck per square foot?

HomeGuide puts deck labour at $11 to $22 per sq ft (HomeGuide, cost to build a deck). It is a larger share for pressure-treated wood, about 60%, because the boards themselves are cheap (HomeGuide, pressure-treated decking cost).

Is it cheaper to resurface a deck than replace it?

Usually, if the frame is sound: you skip demolition and most framing. Have the frame and ledger inspected first.

See the lines